The Project includes complete renovation of a 6000 sf single-story non-reinforced masonry building located opposite the San Leandro High School campus including interior and exterior architectural and infrastructure improvements and structural seismic strengthening designed by Ricky G. Mason, AIA for Collaborative Design Architects. The interior design is based on a simple rectangular parti with a center public core for reception and administrative support and a private perimeter zone for office, library, conference and tutoring activities. The exterior design included contemporary architectural upgrades to storefront, entrance, signage, landscape and parking lot to make the building location and entrances easily identifiable from the street.
Owner: San Leandro Unified School District
Builder: Flory Construction
Cost: $325,000
Status: Completed 1997 Fall